Services · Freezone
Piling & Foundation Contracting
Activity code: 4390001
About this activity
Includes facilities that operate in the field of construction and building the necessary operations in digging the foundations of buildings or the installation of the pillars of the these include tests of the construction site on-site examination of the layers of the soil and the installation of the drilling equipment or on-site installation and install the pillars including checked and tested before and after the installation as well as the testing of concrete foundations to ensure their validity to assume construction This section does not include the following Soil disinfection, see 3900 drilling water wells, see 4220
License details
- Authority
- Ras Al Khaimah Economic Zone
- Emirate
- Ras Al Khaimah
- Zone type
- Freezone
- License type
- Services
- Activity group
- Building contracting
- Industry
- Industrials
Piling & Foundation Contracting Setup Calculator
Registration Timeline
Name Reservation
~30 minutesApproved or rejected by R&L.
Service Request
5 minsShareholders OCR filling.
Document Upload
2 minsSign & upload system-generated list.
Document Checklist
Passport (6mo validity), entry stamp/visa, sponsor NOC (if employed), UBO declaration.
Combining multiple activities? and get an instant rule check.
Fortune Hives is a facilitator and project management consultancy — not a government authority, legal advisor, or guarantor of approval. All information is provided for guidance only and subject to official verification.